Add screenshots #78
ci.yml
on: push
Build Release
1m 23s
Security Audit
2m 42s
Matrix: Test Suite
Annotations
11 errors
|
Test Suite (macos-latest, stable)
Process completed with exit code 1.
|
|
Test Suite (ubuntu-latest, beta)
The operation was canceled.
|
|
Test Suite (ubuntu-latest, beta)
The strategy configuration was canceled because "test.macos-latest_stable" failed
|
|
Test Suite (macos-latest, beta)
The operation was canceled.
|
|
Test Suite (macos-latest, beta)
The strategy configuration was canceled because "test.macos-latest_stable" failed
|
|
Test Suite (windows-latest, stable)
The operation was canceled.
|
|
Test Suite (windows-latest, stable)
The strategy configuration was canceled because "test.macos-latest_stable" failed
|
|
Test Suite (windows-latest, beta)
The operation was canceled.
|
|
Test Suite (windows-latest, beta)
The strategy configuration was canceled because "test.macos-latest_stable" failed
|
|
Test Suite (ubuntu-latest, stable)
The operation was canceled.
|
|
Test Suite (ubuntu-latest, stable)
The strategy configuration was canceled because "test.macos-latest_stable" failed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
smart-diff-cli-linux
Expired
|
2.85 MB |
sha256:449e448461823e7782076845e33ca234eb906e0b7712309082efedf644ac7585
|
|
|
smart-diff-server-linux
Expired
|
3.22 MB |
sha256:5139939222303234ee92dac5f6e4e253c5cae60381365bc64bf41150a3d41962
|
|